Kontron CG2100 Carrier Grade Server Manual do Utilizador Página 35

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 34
34
4. Open the socket by pushing the lever handle down and away from the socket to release
it. (“A” and “B” in
5. Figure 18)
Figure 18. Using the Socket Lever
5. Pull the lever and open the load plate all the way. (Figure 19, “A”)
Figure 19.Opening the Load Plate
6. Remove the processor.
Installing a New Processor
NOTE: Follow the ESD precautions covered in “ESD and Processor Handling Precautions.
To install a processor, follow these instructions:
1. Take the processor out of its packaging and remove the protective shipping cover.
(Figure 20, “A”)
Figure 20. Removing the Shipping Cover
Vista de página 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 109 110

Comentários a estes Manuais

Sem comentários